Lamination and improved drainage in the basin of Rambla Gallinera

Lamination and improved drainage in the basin of Rambla Gallinera
Scope of action: Cuenca Hidrográfica del Jucar
Total investments: 46,000,000 €

Description of worksState: Works in progress

The purpose of the action is the protection against floods in the basin of the rambla Gallinera and Alfadalí ravine, carrying out the provisions of the Director Plan of Defence against Floods in the region of La Safor. The works are the dam of Oliva, partial canalization and conditioning of the rambla Gallinera, with improved drainage of the floodplain, including in this improvement the conditioning of Benirrama Barranco, conditioning and extension of the canalization of the East Channel of the Rambla Gallinera drain, the conditioning of Manegueta de la Rabossa, the deviation of flood flows of Alfadalí ravine to rambla Gallinera through the canalization of Alfadalí ravine passing through Oliva.

STATE OF THE ACTION:

Works in progress.

INSTALLATIONS: