Negratín - Almanzora Link

Negratí­n - Almanzora Link
Scope of action: Cuenca Mediterránea Andaluza
Total investments: 177,400,000 €

Description of worksState: Works in service

The infrastructure consists of a pipeline that supplies water from the Negratín reservoir, in the Guadalquivir basin, to the Almanzora basin, a transfer authorised by decree of December 1999. The infrastructure transports 50 Hm 3 per year and is made up from a 120 km line, 7 regulation pools with a total capacity of 1.35 Hm 3 and two small hydro power plants.

STATE OF THE ACTION:
The Almanzora connection Negratín entered service in February 2004.

INSTALLATIONS: