WWTP and collectors of Alcoletge (Lleida)
The current sewerage network of Alcoletge, in the province of Lleida, is incomplete to cover the entire municipality, and also does not have a system for waste water treatment, so that the discharge of municipal waste water is carried out directly into the river Segre and agricultural irrigation ditches. The action is to complete the sewerage network of the town, and in the construction of a new plant for treatment of urban waste water with a treatment capacity for an average flow of 875 m3/day, to prevent its direct discharge into the river Segre.
STATE OF THE ACTION:
Almanzora -West Almería Link Phase I
The resources generated through desalination are incorporated into Almanzora-West Almería pipeline 1st Phase in the header pool of Venta del Pobre, through a drive that lifts water from the desalination plant in Carboneras. This action provides the infrastructure network that distributes resources for irrigation from the Carboneras desalination plant in Campo de Níjar.
STATE OF THE ACTION:
The plant entered into service in August 2005.