Planta desaladora para riego en Murcia. Aguilas

Descripción de las obrasEstado:

El objetivo de la actuación es resolver los principales problemas hídricos existentes en el Alto Guadalentín y en su zona de influencia, que principalmente, son: la situación de sobreexplotación declarada del acuífero del Alto Guadalentín y la falta de garantías en los envíos desde el trasvase Tajo-Segura. La actuación contempla una desaladora de agua de mar con una capacidad de tratamiento de 60 hm3/año, ampliable a 70 hm3/año.

INSTALACIONES:

Negratín - Almanzora Link

Descripción de las obrasEstado:

The infrastructure consists of a pipeline that supplies water from the Negratín reservoir, in the Guadalquivir basin, to the Almanzora basin, a transfer authorised by decree of December 1999. The infrastructure transports 50 Hm 3 per year and is made up from a 120 km line, 7 regulation pools with a total capacity of 1.35 Hm 3 and two small hydro power plants.

STATE OF THE ACTION:
The Almanzora connection Negratín entered service in February 2004.

INSTALACIONES:

Maintenance and operation of the Turia - Sagunto pipeline

Descripción de las obrasEstado:

This action consists of the Maintenance and Operation of the facilities already built connecting the Canal Júcar-Turia with the city of Sagunto. Its purpose is to optimise the use of water and its proper exploitation

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Rabasa-Fenollar-Amadorio pipeline

Descripción de las obrasEstado:

Maintenance of facilities constructed from Fenollar to Amadorio to optimise the use of water and its proper exploitation.

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Elevation of waters from Rabasa to Fenollar

Descripción de las obrasEstado:

Pipeline that links the deposits of Rabasa and Fenollar and their corresponding impulse. This work aims to ensure the supply of the regions of L'Alicanti and Marina Baja, where an overexploitation of aquifers is occurring.

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Section V: Works for the Corvera-Sucina pool including connecting branch to the network

Descripción de las obrasEstado:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALACIONES:

Section III: Works of Ramal de Alhama branch, including Carrascoy Pool

Descripción de las obrasEstado:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALACIONES:

Section II: Trunk pipeline, Los Almagros pool and branches of La Pinilla and Las Palas

Descripción de las obrasEstado:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALACIONES:

Section I. Works between the exit of the desalination plant and the exit of the Pernera dam

Descripción de las obrasEstado:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms. And 4 annual regulation pools of an approximate volume of 4 hm3.

INSTALACIONES:

Desalination plant to ensure the irrigation of the Tajo-Segura transfer

Descripción de las obrasEstado:

The purpose of this initiative is to supplement the volumes corresponding to the Tajo-Segura transfer for supply and irrigation that, may not be transferred due to the scarcity of resources in the headwaters of the Tajo, or at least reduce, the deficit of application of the irrigated areas dependent on the transfer, by an additional contribution of resources from desalination.

INSTALACIONES: