Restoration of different wetlands in the flood plain (Tarragona)

Descripción de las obrasEstado:

Formerly, in the final section of the floodplain of the river Ebro, there were many points for the discharge of karstic aquifers from the surrounding mountains. Today most have disappeared. The only two remnants of this ecosystem that pose a unique haven of biodiversity are the Marjal of Campredó on the left bank of the Ebro and the Carrova ullals on the right bank, which have a notable state of degradation.

INSTALACIONES:

Integral restoration of the riverside forest in the different areas chosen upstream of Tortosa on river islands and riverbank (Tarragona)

Descripción de las obrasEstado:

Human activity has modified part of the river Ebro by invading it with crops that have reduced the native vegetation of the area. Moreover, all kinds of rubbish and debris have been tipped onto the riverbanks, which contributed to finding vertical banks caused by erosion processes, which generate various areas with a mismatch of trees, and areas where the cane falls towards the river .

INSTALACIONES:

Comprehensive restoration of the riparian forest in the section between Tortosa and the mouth (Tarragona)

Descripción de las obrasEstado:

At present the banks of the Ebro are heavily modified by human activity, as they have been invaded by crops whose implementation has changed the topography of the banks and floodplain. Furthermore, dumping of all kinds of rubbish and debris on the banks of river, contribute to generate vertical banks cause by erosion processes. The action is to develop and restore a riverside ecosystem, which has a certain degree of naturalness and where ecological processes of this environment can be restarted, in a strip of sufficient length.

STATE OF THE ACTION:
Works completed.

INSTALACIONES:

Interpretation centres of the river Ebro and environmental integration of leisure areas on the banks of the river (Tarragona)-TIVENYS

Descripción de las obrasEstado:

In some sections of the lower area of the Ebro, lack of investment and facilities have made the river more of a problem than an asset for the conservation of a heritage that generates wealth and identity. The purpose of this action is the construction and equipping of four visitor centres in the towns of Xerta, Aldover, Mora d'Ebre and Tivenys. The new interpretation centres will disseminate to the public information related to fluvial dynamics, galachos, islands, meanders and river beaches that exist in the lower Ebro.

STATE OF THE ACTION:

Works completed.

INSTALACIONES:

Interpretation centres of the river Ebro and environmental integration of leisure areas on the banks of the river (Tarragona)-ALDOVER

Descripción de las obrasEstado:

In some sections of the lower area of the Ebro, lack of investment and facilities have made the river more of a problem than an asset for the conservation of a heritage that generates wealth and identity. The purpose of this action is the construction and equipping of four visitor centres in the towns of Xerta, Aldover, Mora d'Ebre and Tivenys. The new interpretation centres will disseminate to the public information related to fluvial dynamics, galachos, islands, meanders and river beaches that exist in the lower Ebro.

STATE OF THE ACTION:

Works completed.

INSTALACIONES:

Maintenance and operation of the Turia - Sagunto pipeline

Descripción de las obrasEstado:

This action consists of the Maintenance and Operation of the facilities already built connecting the Canal Júcar-Turia with the city of Sagunto. Its purpose is to optimise the use of water and its proper exploitation

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Rabasa-Fenollar-Amadorio pipeline

Descripción de las obrasEstado:

Maintenance of facilities constructed from Fenollar to Amadorio to optimise the use of water and its proper exploitation.

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Elevation of waters from Rabasa to Fenollar

Descripción de las obrasEstado:

Pipeline that links the deposits of Rabasa and Fenollar and their corresponding impulse. This work aims to ensure the supply of the regions of L'Alicanti and Marina Baja, where an overexploitation of aquifers is occurring.

STATE OF THE ACTION:
The works are in operation.

INSTALACIONES:

Flood prevention in the barranco Benimodo

Descripción de las obrasEstado:

The purpose of this action is to prevent uncontrolled overflow from the Barrabco Benimodo on a 7km long stretch between the junction of the latter with the Barranco de la Parra and the A-7, so that an adequate level of protection against the risk of floods is reached in the neighbouring towns of Carlet, Benimodo, L'Alcudia, Guadassuar and Massalaves, thereby avoiding economic and social impacts that are caused by flooding.

STATE OF THE ACTION:
Work received and delivered.

INSTALACIONES:

Conditioning of lower Serpis as consequence of flood prevention in the middle basin

Descripción de las obrasEstado:

The works are concentrated in the town of Gandia within the boundaries of the so called "Protected Landscape of the Serpis". There will be different actions such as protective walls, creating a channel for low water, actions on the old bridge of Oliva, pumping water for recycling and cleaning and revegetation treatments as well as conditioning of paths, all of which are being studied.

STATE OF THE ACTION:

Works that have been met and received.

INSTALACIONES:

Páginas