Environmental recovery Rambla de San Jerónimo

Descripción de las obrasEstado:

La Rambla de San Jerónimo runs along the foot and bordering the hillock on which the castle of Vera Cruz and its old town is located, so it is visible from many unique places in the city. It also constitutes a urban barrier to growth through its outline around the north and east of the city, since it is a wide and deep ravine. With this conditioning action of the banks and channel, it aims to integrate the rambla within the urban sector and rehabilitate the area that is progressively becoming degraded.

STATE OF THE ACTION:
Work received, delivered and in use.

INSTALACIONES:

Environmental rehabilitation of Azarbe Mayor

Descripción de las obrasEstado:

The action includes the construction of a circular reinforced concrete underground pipeline of between 1.50 and 1.20 m in diameter, extending from the WWTP of Murcia-East to Azarbe Mayor, running through the area of ​​Rincón de San Antón, the hamlet of Llano de Brujas and the site of Cabecicos until reaching Azarbe. With these actions the Town Council of Murcia intends to help farmers from Azarbe Mayor to have treated water from the waste water treatment plant of Rincón de San Antón to irrigate their crops

STATE OF THE ACTION:
Work received, delivered and in use.

INSTALACIONES:

Rambla Canteras Conditioning

Descripción de las obrasEstado:

The works planned under this action can improve safety against floods in the link of the final section of this channel with the rambla Benipila. The Rambla de Canteras, in its final stretch, runs through an urban area of Cartagena and empties into the Rambla de Benipila.

INSTALACIONES:

Benipila canalization

Descripción de las obrasEstado:

The action involves extending the existing canalization in the rambla Benipila whilst it passes through the town of Cartagena for about 3 km, with the aim of reducing the risk of flooding in an area historically affected by floods. These works were included in the control plan against floods of the Segura Basin RDL 4/1987.

The execution of a service road parallel to the rambla Benipila has also been planned.

STATE OF THE ACTION:
Work received, delivered and in use.

INSTALACIONES:

Environmental recovery Archena as it passes through the town centre of Archena

Descripción de las obrasEstado:

Con la presente actuación se pretende integrar el cauce del Segura a su paso por la localidad de Archena dentro del entorno urbano, posibilitando el uso recreativo del espacio fluvial. La actuación incluye la construcción de un paseo sobre la mota del río Segura, en la margen derecha a lo largo de unos 2 km que se inicia a la altura del azud de Iberdrola y termina en las inmediaciones de la actual EDAR de Archena.

ESTADO DE LA ACTUACIÓN:
Obra recibida, entregada y en uso.

INSTALACIONES:

T.M. Ceutí - Completion of environmental recovery of the Segura between Ojós and Contraparada

Descripción de las obrasEstado:

The purpose of the action is the environmental recovery of the stretch of the river Segura within the municipality of Ceutí. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

STATE OF THE ACTION:

Works completed

INSTALACIONES:

Completion of environmental recovery of the Segura between Ojós and Contraparada. T.M. Lorquí

Descripción de las obrasEstado:

The purpose of the action is the environmental recovery of the stretch of the river Segura within the municipality of Lorquí. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

STATE OF THE ACTION:

Works completed.

INSTALACIONES:

T.M. Torres de Cotillas - Completion of environmental recovery of the Segura between Ojós and Contraparada.

Descripción de las obrasEstado:

The purpose of the action is the environmental recovery of the stretch of the river Segura within the municipality of Las Torres de Cotillas. This area is quite degraded mainly due to pollution and manipulation by man.

STATE OF THE ACTION:

Works completed.

INSTALACIONES:

T.M. Molina del Segura - Completion of environmental recovery of the Segura between Ojós and Contraparada

Descripción de las obrasEstado:

The purpose of the action is the environmental recovery of the stretch of river Segura within the municipality of Molina de Segura. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

STATE OF THE ACTION:

Work completed.

INSTALACIONES:

Completion of environmental recovery of the Segura between Ojós and Contraparada. T.M. Alguazas

Descripción de las obrasEstado:

The action aims to environmentally recover the stretch of the river Segura within the municipality of Alguazas. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

Furthermore, it takes into account the functionality of the works so that not only one zone is recovered but sustainable uses are also promoted, whether recreational, such as fishing, walking or other sports; teaching, such as observation points for riverside species; and conservationist, as part of minimising the potential impacts of other activities.

INSTALACIONES: