Infrastructures for flood prevention in the middle basin

Descripción de las obrasEstado:

The purpose pursued by the action is to increase the level of protection against floods in the middle basin of the river Serpis. To achieve this the construction of a dam in the town of Terrateig is being studied, together with building defences against erosion and flooding in various parts of the whole basin and diverting part of the flow from the Barranco de Piles to the river Serpis, all complemented with environmental mitigation measures associated with the works included in the action.

STATE OF THE ACTION:
Work underway.

INSTALACIONES:

Lamination and improved drainage in the basin of Rambla Gallinera

Descripción de las obrasEstado:

The purpose of the action is the protection against floods in the basin of the rambla Gallinera and Alfadalí ravine, carrying out the provisions of the Director Plan of Defence against Floods in the region of La Safor.

INSTALACIONES:

Major repairs and automation of the main channel of Campo del Turia (Valencia). Division 1 and 2

Descripción de las obrasEstado:

The purpose of this action is to ensure that the channel properly provides the service for which it was designed, that is to transport water from the river Turia, from Benagéber Reservoir, to the Campo del Turia, for irrigation. Currently this service cannot be provided with sufficient guarantees due to numerous structural problems and deficiencies in the control elements.

INSTALACIONES:

Modernisation of Júcar-Turia channel (Valencia)

Descripción de las obrasEstado:

The main object of this action is to eliminate the vulnerability of supply of Valencia which is caused by the fact of being supplied through a free surface pipeline. To avoid this and to optimise the management of resources, the transport of flows for supply using a pressure pipe are planned to be encased.

STATE OF THE ACTION:
Under study phase for alternatives.

INSTALACIONES:

New collector west of Albufera

Descripción de las obrasEstado:

The action aims to reduce inputs of organic matter and inorganic nutrients currently discharged to Lake Albufera of Valencia. These inputs originate as a result of discharges of stormwater from the western collector located in the northwest of Albufera and from the pollution that the irrigation infrastructure receives as it passes through the towns, and whose surpluses reach Albufera.

INSTALACIONES:

Reuse of purified waste water of Albufera Sur (Valencia)

Descripción de las obrasEstado:

This activity has a dual purpose. On the one hand, it aims to achieve an efficient reuse of effluent from the waste water treatment plant of Albufera Sur for irrigation, and secondly, to improve the quantity and quality of water contributions to Lake Albufera. To achieve this goal a tertiary treatment is implemented at the plant and a green filter that improves the quality of effluents intended for lake Albufera.

STATE OF THE ACTION:

The work is in progress.

INSTALACIONES:

Reuse of purified waste water in the Sueca WWTP

Descripción de las obrasEstado:

The action aims to improve the water quality of the Sueca ditches by intercepting waste water discharges and disconnecting them from the network of ditches. This way, the effluent generated is reused efficiently by the waste water treatment plant of Sueca by its discharge into the Major ditch, and thus increase the susceptible irrigated area and change the crop types to be irrigated.

INSTALACIONES:

Completion of reuse of waste water in Pinedo (Valencia)

Descripción de las obrasEstado:

The aim of this action is to provide new water resources from the reuse of effluent from the water treatment plant of Pinedo for its use in irrigation of agricultural crops and as additional water to the Albufera of Valencia, with appropriate quality for each use. The action consists of a pipeline infrastructure that enables connection from waste water treatment plant to the irrigation areas, and a green filter for the reduction of nutrients, with their associated pipeline, for renaturalisation of the waters that cannot be used in irrigation and supply them to the Albufera.

INSTALACIONES:

New Júcar-Vinalopó pipeline

Descripción de las obrasEstado:

The regions of Vinalopó and Alicantí in the province of Alicante, have had major water shortages for years. This deficit is being covered by the overexploitation of aquifers, several of them have already reached totally unsustainable levels. In coastal regions, where demand is mostly urban, the situation can be successfully resolved by the desalination of seawater, but in the interior regions, where demand is mainly agrarian and stands at quite high levels above sea level, the contribution of resources from other basins is necessary.

INSTALACIONES:

Conditioning of the river Mula passing through Albudeite

Descripción de las obrasEstado:

This action is intended to prevent personal and material damage that could be caused by the bursting of the river Mula's banks as it passes through Albudeite. The canalization, which has a section of 1300 metres and can drain up to 980 cubic meters per second (m3 / s), is able to accommodate flow rates of up to 3 m3 / s. These works were included in the control plan against floods of the Segura Basin RDL 4/1987.

STATE OF THE ACTION:
Work received, delivered and in use.

INSTALACIONES: