Desalination plant in Balerma. Campo de Dalías

Description of worksState:

The main objective for this initiative is to generate water resources both for urban and agricultural purposes thanks to the construction of this plant with a production capacity of 30 hm3/year.

INSTALLATIONS:

Negratín - Almanzora Link

Description of worksState:

The infrastructure consists of a pipeline that supplies water from the Negratín reservoir, in the Guadalquivir basin, to the Almanzora basin, a transfer authorised by decree of December 1999. The infrastructure transports 50 Hm 3 per year and is made up from a 120 km line, 7 regulation pools with a total capacity of 1.35 Hm 3 and two small hydro power plants.

STATE OF THE ACTION:
The Almanzora connection Negratín entered service in February 2004.

INSTALLATIONS:

Pi collector

Description of worksState:

The urban centre of Pi, located in the province of Lleida, is located two miles south of the town of Bellver de Cerdanya and is an annex to it. This town has no sanitation system, dumping sewage generated in the Pi stream, which drains into the river Segre. The action involves the construction of a collector to send the waste water generated in the urban centre of Pi to the waste water treatment plant at Bellver, thus avoiding direct discharge to the Pi.

STATE OF THE ACTION:

Works completed.

INSTALLATIONS:

WWTP and collectors of Sant Jaume de Enveja (Tarragona)

Description of worksState:

The town of Sant Jaume d'Enveja, in the province of Tarragona, does not currently have a system of for waste water treatment, carrying out the discharge of waste water directly to the River Ebro. Waste water discharges are characterised by being greatly diluted in the summer months by mixing the sewage with the surplus irrigation from rice fields, while in the winter months such dilution does not occur. The action involves the construction of a new waste water treatment plant which can handle an average flow of 2,426 m3/day and construction of auxiliary pipelines.

INSTALLATIONS:

WWTP and collectors of Termens and Menarguens (Lleida)

Description of worksState:

The town centre of Térmens, in the province of Lleida, currently has a sewer network that is not in use and a sanitation infrastructure to make contributions to irrigation water, which discharges with no treatment directly to the river Segre. Furthermore the town of Menarguens near to Térmens, currently has a collector that collects waste water from the town to which various irrigation branches are incorporated, and as in the case above, the water is discharged into the river Segre without any treatment .

INSTALLATIONS:

Uldemolins WWTP (Tarragona)

Description of worksState:

The town Ulldemolins, in the province of Tarragona, does not have any waste water treatment system, currently discharging them through two points to the river Montsant and a third point in the Olla canyon. The action involves the construction of a waste water treatment plant capable of treating current discharges current and those planned in the future.

STATE OF THE ACTION:
Works completed.

INSTALLATIONS:

Horta de Sant Joan WWTP (Tarragona)

Description of worksState:

The town of Horta de Sant Joan, in the province of Tarragona, does not have waste water treatment system, since the waste water treatment plant is out of service, causing dumping of untreated discharges into ravines of Vilans and Les Vinyasses, tributaries of the river Algars. The action involves the construction of a new waste water treatment plant capable of treating an average flow of 756 m3/day of waste water and construction of collectors required to address dumping in the ravines indicated above.

STATE OF THE ACTION:
Works completed.

INSTALLATIONS:

Extending the outlet collector of the Alguaire waste water treatment plant (Lleida)

Description of worksState:

The town of Alguire, in the province of Lleida, has a waste water treatment plant that has never been put into operation since it does not have a collector for the discharge of treated water. The action involves the construction of a collector that discharges the treated water into the waste water treatment plant, so that now this can be put into operation.

STATE OF THE ACTION:

Works completed.

INSTALLATIONS: