T.M. Molina del Segura - Completion of environmental recovery of the Segura between Ojós and Contraparada

Description of worksState:

The purpose of the action is the environmental recovery of the stretch of river Segura within the municipality of Molina de Segura. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

STATE OF THE ACTION:

Work completed.

INSTALLATIONS:

Completion of environmental recovery of the Segura between Ojós and Contraparada. T.M. Alguazas

Description of worksState:

The action aims to environmentally recover the stretch of the river Segura within the municipality of Alguazas. This stretch of the river Segura is quite degraded mainly due to pollution and manipulation by man.

Furthermore, it takes into account the functionality of the works so that not only one zone is recovered but sustainable uses are also promoted, whether recreational, such as fishing, walking or other sports; teaching, such as observation points for riverside species; and conservationist, as part of minimising the potential impacts of other activities.

INSTALLATIONS:

Regrowth of the channel on the right bank of the post-transfer Tagus-Segura. End section of Segura siphon to the start of the Campos del Río aqueduct

Description of worksState:

This action has increased the capacity of the channel on the right bank of the Tajo-Segura distribution channel through the regrowth of the two side walls of the channel, in order to improve the transport capacity of the water.

INSTALLATIONS:

Section VI: works of the Cañarico branch

Description of worksState:

The action involves extending the distribution network of Valdelentico at around the end of Section III to connect the branch of Section III to the distribution network of Valdelentico, with the Cañarico area in the town of Alhama in Murcia.

INSTALLATIONS:

Section V: Works for the Corvera-Sucina pool including connecting branch to the network

Description of worksState:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALLATIONS:

Section III: Works of Ramal de Alhama branch, including Carrascoy Pool

Description of worksState:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALLATIONS:

Section II: Trunk pipeline, Los Almagros pool and branches of La Pinilla and Las Palas

Description of worksState:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms.

INSTALLATIONS:

Section I. Works between the exit of the desalination plant and the exit of the Pernera dam

Description of worksState:

This stage takes into account the works needed to distribute the water produced in the Valdelentisco desalination plant for irrigation and urban supply to part of the Murcia Region, areas of Sucina, Los Martinez del Puerto, Alhama and Fuente Alamo and bordering adjacent areas and to the north of the post-Tajo-Segura transfer zone. It includes the propulsion works and regulating deposits to raise line 290 desalinated water, hydraulic system distribution head with conductions that work with pressure by gravity with 85 kms. And 4 annual regulation pools of an approximate volume of 4 hm3.

INSTALLATIONS:

Water allocation system from Cerro Colorado reservoir to the Guadalentin valley

Description of worksState:

The project involves construction of a pipeline that will feed desalinated water from Águilas desalination plant to the Irrigation Communities of Puerto Lumbreras and Lorca, established along the Valle del Alto Guadalentín. The source of the pipeline is established in the Cerro Colorado reservoir, which forms part of the actions of the Águilas/Guadalentín desalination plant.

Works are underway

INSTALLATIONS:

Supply project to Pulpi

Description of worksState:

The purpose of the action is to provide the towns of the coastal area of Pulpí with a pipeline that will cover the supply requirements planned in the future with resources from the desalination plant of Águilas/Guadalentín. The new pipeline, with capacity to supply a flow of 2 hm3/year will complement the existing one managed by GALASA, so that between the two they can meet the daily consumption forecast for the days of maximum occupancy.

The works are pending tender.

INSTALLATIONS: